Public display

Project for the redevelopment of the areas around schools included in the “Protegim les escoles” programme (for 2021) in the districts of Horta-Guinardó and Nou Barris, in Barcelona.

Projecte de reurbanització dels entorns de les escoles incloses en el programa “Protegim les escoles” (actuacions 2021) als districtes d’Horta-Guinardó i Nou Barris de Barcelona

The GOVERMENT COMMISSION, in its session of 18 February 2021, approved the following proposal:

TO GRANT INITIAL APPROVAL to the project to redevelop the areas around schools included in the “Protegim les escoles” programme (for 2021) in the districts of Horta-Guinardó and Nou Barris, in Barcelona, a municipal initiative, in accordance with the technical report for the project included in the administrative file and deemed reproduced, with a budget of 840,431.08 euros, value added tax (VAT) of 21% included, in accordance with article 235.2 of legislative decree 2/2003, of 28 April, which approves the consolidated text of the municipal and local law of Catalonia; and TO SUBMIT IT to public scrutiny for a period of 30 working days, starting from the day after its publication in the Official Gazette of the Province of Barcelona (BOPB), during which time it may be examined and any relevant complaints or proposals formalised.

Public display period: from 26/02/2021 to 12/04/2021 (first and last days included)

Plan for the installation of three flights of escalators between Carrer Arenys and Carrer Fastenrath, in the Teixonera neighbourhood of the Horta-Guinardó district in Barcelona (7BD 2020/026)

Projecte d’instal·lació de tres trams d’escales mecàniques entre el c. Arenys i el c. Fastenrath, al barri de la Teixonera, al districte d’Horta-Guinardó, a Barcelona (7BD 2020/026)

The GOVERMENT COMMISSION, at its session of 18 February 2021, approved the following proposal:

 

To give initial APPROVAL to the plan for the installation of three flights of escalators between Carrer Arenys and Carrer Fastenrath, in the Teixonera neighbourhood of the Horta-Guinardó district in Barcelona, a municipal initiative, in accordance with the technical report on the plan appearing in the administrative dossier, which is deemed to have been included herein for these purposes, with a budget of €1,062,317.24, including value added tax (VAT) at 21%, in accordance with Article 235.2 of Legislative Decree 2/2003 of 28 April approving the consolidated text of the Municipal and Regional Law of Catalonia (TRLLMRLC); and TO SUBJECT IT to public scrutiny for a period of 30 working days from the day immediately following that of its publication in the Official Gazette of the Province of Barcelona (BOPB), during which time it may be examined and any relevant comments and objections may be lodged.

Public scrutiny period: from 26/02/2021 to 12/04/2021 (first and last days included)

The plan will be on display to the public for thirty days and may be viewed online at https://ajuntament.barcelona.cat/ca/informacio-administrativa/exposicio-publica, as well as at the Department of Licences and Public Space of the Horta-Guinardó District, Carrer de Lepant, 387, planta 1a, with a prior appointment requested through the Online Assistance Service: https://ajuntament.barcelona.cat/horta-guinardo/ca/contacte.

Within the period stated, starting from the day after its publication in the Official Gazette of the Province of Barcelona, interested parties may scrutinise it and present any complaints or proposals they deem relevant.

Project for redeveloping the west pavement along Carrer del Doctor Giné i Partagàs (between Carrer de la Maquinista and Carrer de Ginebra), in the La Barceloneta neighbourhood, Stage 2, in the Ciutat Vella district in Barcelona.

Projecte de reurbanització de la vorera oest del carrer Doctor Giné i Partagàs (entre el carrer de la Maquinista i el carrer Ginebra), al barri de la Barceloneta, Fase 2, al Districte de Ciutat Vella a Barcelona.

The Manager for Urban Ecology adopted the following decision on 25 February 2021:           

TO GRANT INITIAL APPROVAL to the Project for redeveloping the west pavement along Carrer del Doctor Giné i Partagàs (between Carrer de la Maquinista and Carrer de Ginebra), in the La Barceloneta neighbourhood, Stage 2, in the Ciutat Vella district in Barcelona, a municipal initiative in accordance with the Project Technical Report (ITP) included in the administrative file and as such deemed reproduced, with a budget of 95,486.07 euros, Value Added Tax (VAT) of 21% included, in accordance with Article 235.2 of Legislative Decree 2/2003, of 28 April, approving the consolidated text of the Municipal and Local Government in Catalonia Act (TRLLMRLC); and TO SUBMIT IT to public scrutiny for a period of 30 working days, starting from the day after its publication in the Official Barcelona Province Gazette (BOPB), during which time it may be examined and any relevant objections raised; and TO ENSURE ITS FINAL APPROVAL, provided no objections have been raised during the period of public scrutiny and no reports received expressing any need to introduce any amendments to the project.

Public scrutiny period: from 17/03/2021 to 29/04/2021 (first and last days included).

Complete architectural plan, environmental report and health and safety study on the changes to the Engine Room at the lake at Parc Central de Nou Barris, in Barcelona's Nou Barris district

EP Proj Exec Memòria Ambiental Parc Central Nou Barris

The GOVERNMENT COMMISSION approved the following proposal at its meeting of 18  March 2020:

(8BD 2021/017) TO GRANT INITIAL APPROVAL to the Complete Architectural Plan, environmental report and health and safety study on the changes to the Engine Room at the lake at Parc Central de Nou Barris, in Barcelona's Nou Barris district, a municipal initiative, in accordance with the technical report for the Plan which is deemed reproduced here for these purposes, for these purposes, with a budget of 878,012.30 euros, 21% VAT included, under article 235(2) of Legislative Decree 2/2003, of 28 April, approving the consolidated text of the Act on Catalan Municipal and Local Authority Systems; and TO SUBMIT IT to public scrutiny for a period of 30 work days, starting from the day after its publication in the Official Gazette of the Province of Barcelona (BOPB), during which time it may be examined and any relevant challenges lodged.

Public scrutiny period: from 01/04/2021 to 14/05/2021 (first and last days included).

Final project to redevelop La Rambla, in the Ciutat Vella district of Barcelona

Projecte executiu de reurbanització de la Rambla, al Districte de Ciutat Vella de Barcelona

The ECOLOGY, URBAN PLANNING, INFRASTRUCTURES AND MOBILITY COMMISSION, in its session of  16 March 2021, approved the following proposal:

 6(1BC 2018/121) TO GRANT INITIAL APPROVAL to the final project for the redevelopment of La Rambla in the Ciutat Vella district of Barcelona, a municipal initiative, in accordance with the technical compliance report on the project included in the administrative file, which is deemed to have been included herein, with a budget of €44,563,976.90, including value added tax (VAT) at 21%, in accordance with Article 235.2 of Legislative Decree 2/2003 of 28 April, which approves the revised text of the Municipal and Local Law of Catalonia; and TO SUBJECT IT to public scrutiny for a period of 30 working days, starting from the day after its publication in the Official Bulletin of the Province of Barcelona (BOPB) and in one of the newspapers with the largest circulation in Catalonia, during which time it may be examined and any relevant complaints or proposals may be submitted; and TO INFORM the Special Delegation of the Ministry of Defence about this proposal; and TO REQUEST the mandatory report and authorisation from them, which must be obtained prior to the project being definitively approved.

Public scrutiny period: from 01/04/2021 to 21/06/2021 (first and last days included).

Executive project for a self-consumption photovoltaic facility at the southern mouth of the Badal tunnel, in Barcelona’s Sants-Montjuïc district

Projecte executiu d’una instal·lació fotovoltaica d’autoconsum a la boca sud del túnel de Badal, al districte de Sants-Montjuïc de Barcelona

The Manager for Urban Ecology adopted the following decision on 26 March 2021:

GRANTING INITIAL APPROVAL to the Executive Project for a self-consumption photovoltaic facility at the southern mouth of the Badal tunnel, in Barcelona’s Sants-Montjuïc district, a municipal initiative in accordance with the Technical Report (ITP) for the project appearing in the administrative file and which are reproduced for these purposes, with a budget of 166,288.58 euros, including value added tax (VAT) of 21%, in accordance with Article 235(2) of Legislative Decree 2/2003, of 28 April, approving the consolidated text of the Act on Catalan municipal and local law (TRLLMRLC); and SUBMITTING IT to public scrutiny for a period of 30 working days, starting from the day after its publication in the Official Gazette of the Province of Barcelona (BOPB), during which time it may be examined and any challenges lodged against it; and GRANTING IT FINAL APPROVAL, provided no challenges have been made against it within the public-scrutiny deadline and no reports have been received expressing the need to introduce any amendments to the project.

Public scrutiny period: from 09/04/2021 to 21/05/2021 (first and last days included).

Final plan for renovation and adaptation work on the Teatre Arnau, in Barcelona’s Ciutat Vella district

Projecte executiu de les obres de rehabilitació i adequació del Teatre Arnau, al districte de Ciutat Vella de Barcelona

The GOVERNMENT COMMISSION, in its session of 25 March 2021, approved the following proposal:

(1BC 2016/199) TO GRANT INITIAL APPROVAL to the Final plan for renovation and adaptation work on the Teatre Arnau, in Barcelona’s Ciutat Vella district, a municipal initiative in accordance with the technical report on the project included in the administrative file, and as such deemed reproduced, with a budget of 11,681,627.04 euros, including 21% value added tax (VAT), in accordance with Article 235(2) of Legislative Decree 2/2003, of 28 April, approving the consolidated text of the Act on Catalan municipal and local law; and TO SUBMIT IT to public scrutiny for a period of 30 working days, starting from the day after its publication in the Official Gazette of the Province of Barcelona (BOPB) and in one of the newspapers with the largest circulation in Catalonia, during which time it may be examined, and any relevant challenges lodged.

Public scrutiny period: from 09/04/2021 to 21/05/2021 (first and last days included).

Executive project for reurbanising Carrer Gran de Sant Andreu - section 2 (between Carrer de Joan Torras and Plaça de Mossèn Clapés), in Barcelona’s Sant Andreu district

Projecte executiu de reurbanització del carrer Gran de Sant Andreu - tram 2 (entre el carrer de Joan Torras i la plaça de Mossèn Clapés), al districte de Sant Andreu de Barcelona

The GOVERNMENT COMMISSION, in its session of 25 March 2021, approved the following proposal:

(9BD 2017/006) TO GRANT INITIAL APPROVAL to the executive project for reurbanising Carrer Gran de Sant Andreu - section 2 (between Carrer de Joan Torras and Plaça de Mossèn Clapés), in Barcelona’s Sant Andreu district, a municipal initiative, in accordance with the technical report for the plan which appears in the administrative file and is deemed reproduced here, for these purposes, with a budget of 4,146,649.29 euros, 21% VAT included, under Article 235(2) of Legislative Decree 2/2003, of 28 April, approving the consolidated text of the Act on Catalonia’s Municipal and Local Authority Systems (TRLMRLC); to NOTIFY the parties concerned of this procedure, and TO SUBMIT IT to public scrutiny for a period of 30 work days, starting from the day after its publication in the Official Gazette of the Province of Barcelona (BOPB) and in one of the newspapers with the highest circulation in Catalonia, during which time it may be examined and any relevant challenges lodged.

Public scrutiny period: from 09/04/2021 to 21/05/2021 (first and last days included).

NOTICE on the public display of Barcelona’s Urban Mobility Plan and the environmental sustainability report.

EDICTE sobre l’exposició pública del Pla de mobilitat urbana de Barcelona i de l'Informe de sostenibilitat ambiental.

Barcelona City Council’s Urban Mobility Plan, having received initial approval by agreement of the Commission for Ecology, Urban Planning Infrastructures and Mobility, during its meeting of 14 December 2020, together with the environmental sustainability report, shall be subject to public scrutiny for a period of 45 working days, starting from the last publication of the announcement in the Official Provincial Bulletin, the Gazette of the Government of Catalonia, the corporation noticeboard and one of the newspapers with the biggest circulation, in compliance with Article 23 of Act 6/2009, of 28 April, on the environmental assessment of plans and programmes.

Claims and challenges may be presented to the City Council within the period of public scrutiny, through any of the means permitted under Act 39/2015, of 1 October, on common administrative procedures for public administrations.

Public scrutiny period: from 13/04/2021 to 15/06/2021 (first and last days included)

 

Executive project for a self-consumption photovoltaic facility at the Rovira tunnel, in Barcelona’s Horta-Guinardó district (7BC 2021/053)

Projecte executiu d’una instal·lació fotovoltaica en autoconsum al túnel de la Rovira, al districte d’Horta-Guinardó de Barcelona (7BC 2021/053)

The Manager for Urban Ecology adopted the following decision on 8 April 2021:

TO GRANT INITIAL APPROVAL to the Executive Project for a self-consumption photovoltaic facility at the Rovira tunnel, in Barcelona’s Horta-Guinardó district, a municipal initiative in accordance with the Technical Report (ITP) for the project dated 25 March 2021 appearing in the administrative file and which is deemed reproduced for these purposes, with a budget of 160,649.86 euros, including value added tax (VAT) of 21%, in accordance with Article 235(2) of Legislative Decree 2/2003, of 28 April, approving the consolidated text of the Catalan Municipal and Local Administration Act (TRLLMRLC); and TO SUBMIT IT to public scrutiny for a period of 30 working days, starting from the day after its publication in the Official Gazette of the Province of Barcelona (BOPB), during which time it may be examined and any challenges lodged against it; TO NOTIFY the parties concerned; and TO GRANT IT FINAL APPROVAL, provided no challenges have been made against it within the public scrutiny deadline and no reports have been received expressing the need to introduce any amendments to the project.

The project will remain on public display for a period of thirty (30) working days and may be consulted online from this website or from the Information and Documents Department at the Manager’s Office for Urban Ecology, through the online support system: https://w10.bcn.cat/APPS/irsconsultesWeb/continuar.executant.do?detall=4689&directo=0

The parties concerned may examine the project within the above-mentioned period, which will start on the day following its latest date of publication, and lodge any challenges to it they deem relevant.

Public scrutiny period: from 14/01/2021 to 27/05/2021 (first and last days included).

Master project for the external and internal restoration of the hibernaculum at Parc de la Ciutadella, in Passeig de Picasso, in Barcelona’s Ciutat Vella District

Projecte executiu de restauració interior i exterior de l’hivernacle de la Ciutadella, al passeig de Picasso, al Districte de Ciutat Vella de Barcelona

The GOVERNMENT COMMISSION, in its session of 23 April 2020, approved the following proposal:

(1BC 2020/108) TO GRANT INITIAL APPROVAL to the executive project for the exterior and interior restoration of the Hivernacle de la Ciutadella, in Passeig de Picasso, in the Ciutat Vella district of Barcelona, a municipal initiative, in accordance with the technical report on the project included in the administrative file, reproduced here for these purposes, with a budget of 2,002,621.75 euros, including value added tax (VAT) at 21%, in accordance with Article 235.2 of Legislative Decree 2/2003 of 28 April which approves the consolidated text of the Municipal and Local Law of Catalonia; and TO SUBMIT IT to public scrutiny for a period of 30 working days, starting from the day after its publication in the Official Bulletin of the Province of Barcelona (BOPB) and in one of the newspapers with the largest circulation in Catalonia, during which time it may be examined, and any relevant challenges lodged.

Public scrutiny period: from 16/04/2021 to 28/05/2021 (first and last days included).

Public scrutiny for the procedure to establish a real surface right in favour of the Foundation for the Universitat Oberta de Catalunya (UOC) in relation to the municipally owned property located at Carrer de Sant Joan de Malta, 64-74 (formerly the Can Jaumandreu factory) permitting it to be used, among other things, to house the UOC’s Escola de Doctorat, research centres and management units for the purpose of carrying out a project relating to a variety of fields, such as research and initiatives focused on collaborative economies, the boosting of digital skills and collaboration in educational matters, or developing initiatives in the field of intelligence, data and talent, or spaces for labour mediation, as established in the protocol on the partnership for the development of the area known as Can Jaumandreu signed on 2 December 2020 between the UOC and Barcelona City Council.

Exposició Pública DP-2021-28023

TO CREATE a real surface right in favour of the Foundation for the Universitat Oberta de Catalunya (UOC) in relation to the municipally owned property at Carrer de Sant Joan de Malta, 64-74 (formerly the Can Jaumandreu factory) shown on the map attached, for a period of fifteen years with the possibility of extending that period for a further ten years and on payment of a fee; to be used, among other things, to house the UOC’s Escola de Doctorat, research centres and management units for the purpose of carrying out a project relating to a variety of fields, such as research and initiatives focused on collaborative economies, boosting digital skills and collaboration in educational matters or developing initiatives in the fields of intelligence, data and talent, or spaces for labour mediation, as established in the protocol on the partnership for the development of the area known as Can Jaumandreu signed on 2 December 2020 between the UOC and Barcelona City Council; TO SUBJECT the file to public scrutiny for twenty days and, if no claims or allegations are made, to deem this resolution to have been finally approved; TO FORMALISE the right in accordance with the terms of the attached document, which is hereby approved; TO REGISTER it in the Property Register; and TO AUTHORISE the Mayor’s Office to take all appropriate actions to establish the details of this resolution, clarify it and carry it out.

Public scrutiny period: from 20/04/2021 to 17/05/2021 (first and last days included).

 

Public scrutiny of the dossier on the approved regulatory Administrative Specifications for the acquisition of commercial premises in Barcelona (lots 1 and 2), through public-competition procedures; these specifications were granted initial approval by agreement of the Government Commission during its meeting of 22 April 2021

Adquisició locals Ciuta Barcelona DP-2021-28096

AUTHORISING the expenditure of €10,000,000, under budgetary entry 2021 0701 62216 93311 for the 2021 financial year, which will be distributed in two lots: €8,000,000 for lot number 1, and €2,000,000 for lot number 2; GRANTING initial APPROVAL to the regulatory specifications for the procedure for acquiring premises in Barcelona for the purposes of increasing the number of the City Council’s premises, through open and ordinary public-competition procedures; SUBMITTING THEM to public scrutiny for a period of twenty days and, if no claims or challenges are lodged against them highlighting the need for introducing amendments to them, TO AUTOMATICALLY CONVERT this initial approval into final approval; CALLING FOR a public competition for the award of these acquisitions.

Public scrutiny period: from 27/04/2021 to 25/05/2021 (first and last days included)

Call for public-competition applications, through open and ordinary awarding procedures, for private-use concessions for the supply, installation, conservation and exploitation for advertising purposes of certain elements of the city's urban furniture

Patrimoni Convocatoria licitació 27976

RESOLVING the challenges submitted by the companies Clear Channel España, SL and JCDecaux España, SL in the public-information procedure of the regulatory Tendering Specifications, incorporating the Technical Specifications, of the private-use concession for the supply, installation, conservation and exploitation for advertising purposes of certain elements of the city’s urban furniture, granted initial approval by agreement of the Municipal Council’s Commission for Economy and Tax Office at its meeting of 20 January 2021, in accordance with the report from the Directorate for Heritage Planning and Coordination Services of 13 April 2021 on assessing challenges, a report provided in the dossier and incorporated into this agreement, with the reasons set out; and, as a result, AMENDING, as stated in the above-mentioned report, the regulatory Tendering Specifications and the Technical Specifications; GRANTING THEM FINAL APPROVAL; CALLING FOR public-competition applications, through open and ordinary awarding procedures, and AUTHORISING the Mayor’s Office to carry out the necessary actions aimed at specifying, clarifying and performing this agreement.

Public display period: from 06/05/2021 to 20/05/2021 (first and last dates included)

 

Submission to public scrutiny of the amendment to the Tax Board’s framework regulations granted initial approval on 21 April 2021

Reglament Orgànic del Consell Tributari

The Commission for Economy and Tax Office adopted the following agreement during its meeting of 21 April 2021:

“TO GRANT INITIAL APPROVAL to the amendment to the Tax Board’s framework regulations and to Submit them to public scrutiny for a period of 30 days, starting from the day following their date of publication in the Official Province Gazette, under Article 178(1) of consolidated text of the Catalan Act on Municipal and Local Law, as approved by Legislative Decree 2/2003, of 28 April, and under Article 112 of the Municipal Framework Regulations.”

Period of display for public scrutiny: from 30/04/2021 to 11/06/2021 (first and last days included)

Scrutiny of the file for the approval of the Tendering Specifications for the acquisition of commercial premises in the Ciutat Vella district by means of a public tender. The specifications were initially approved in a Government Commission resolution passed at its meeting of 22 April 2021.

Adquisició locals CV DP-2021-28095

TO AUTHORISE an expense of €6 million against budgetary item 2021 0701 62203 93311; TO INITIALLY APPROVE the Tendering Specifications relating to the procedure for the acquisition of commercial premises in the Ciutat Vella district of Barcelona city in order to increase the number of commercial premises belonging to the City Council, by means of an open tender processed under the ordinary procedure; TO SUBMIT IT to public scrutiny for a period of twenty days and, in the absence of any claims or arguments showing the need for any amendments: TO AUTOMATICALLY DEEM this initial approval resolution as upgraded to a final resolution, and; TO CALL a public tender for the award of the acquisitions.

Public scrutiny period: from 27/04/2021 to 25/05/2021 (first and last days included)

Final project for the structural and constructive consolidation of the Palau Marquès d’Alfarràs, Horta-Guinardó district, Barcelona (7BC 2015/072)

The GOVERNMENT COMMISSION, in its session of 22 April 2021, approved the following proposal:

(7BC 2015/072) TO GRANT INITIAL APPROVAL to the executive project for the structural and constructive consolidation of the Palau Marquès d’Alfarràs, Horta-Guinardó district, Barcelona, a municipal initiative, in accordance with the technical report on the project included in the administrative file, reproduced here for these purposes, with a budget of 4,184,163.37 euros, including value added tax (VAT) at 21%, in accordance with Article 235.2 of Legislative Decree 2/2003 of 28 April which approves the consolidated text of the Municipal and Local Law of Catalonia; and TO SUBMIT IT to public scrutiny for a period of 30 working days, starting from the day after its publication in the Official Bulletin of the Province of Barcelona (BOPB) and in one of the newspapers with the largest circulation in Catalonia, during which time it may be examined, and any relevant challenges lodged.

The project will remain on public display for a period of thirty (30) working days and may be consulted online on the website https://ajuntament.barcelona.cat/ca/informacio-administrativa/exposicio-publicaor in the Information and Documents Department at the Manager’s Office for Urban Ecology, through the online support system: https://w10.bcn.cat/APPS/irsconsultesWeb/continuar.executant.do?detall=4689&directo=0 

Interested parties may examine the plan within the above-mentioned period, which will start on the day following its latest date of publication, and lodge any challenges they deem relevant.

Public scrutiny period: from 05/05/2021 to 21/06/2021 (first and last days included).

Final project for the neighbourhood space inat Mercat de Sant Antoni, in the Eixample district of Barcelona

The GOVERNMENT COMMISSION, in its session of 29 April, 2021, approved the following proposal:

(2BD 2021/033) TO GRANT initial approval to the final project for the neighbourhood space inat Mercat de Sant Antoni, in the Eixample district of Barcelona, a municipal initiative, in accordance with the technical report on the project included in the administrative file, reproduced here for this purpose, with a budget of 1,431,370.03 euros, including value added tax (VAT) at 21%, in accordance with Article 235.2 of Legislative Decree 2/2003, of 28 April, which approves the revised text of the Municipal and Local Law of Catalonia; and TO SUBMIT IT to public scrutiny for a period of 30 working days, starting from the day after its publication in the Official Bulletin of the Province of Barcelona (BOPB) and in one of the newspapers with the largest circulation in Catalonia, during which time it may be examined, and any relevant challenges lodged.

Public scrutiny period: from 06/05/2021 to 17/06/2021 (first and last days included)

General terms and conditions regulating the awarding of subsidies for the reactivation of economic activities in the city of Barcelona

In accordance with article 18 of Act 38/2003, of 17 November, on general subsidies, and articles 43 and 45 of Act 39/2015, of 1 October, on the common administrative procedure for public administrations, and the general terms and conditions regulating the awarding of subsidies for the reactivation of economic activities in the city of Barcelona, the full text of the agreement from the Government Commission, in its session of 8 April 2021 is MADE PUBLIC : To grant INITIAL APPROVAL to the general terms and conditions regulating the awarding of subsidies for the reactivation of economic activities in the city of Barcelona, to ORDER the publication of the above-mentioned terms and conditions in the Official Gazette of the Province of Barcelona, on electronic notice boards and the website of the City Council, and the inclusion of a reference to

this announcement in the Municipal Gazette. To SUBMIT THEM to public scrutiny for a period of twenty working days, starting from the day after the date of the stated publication and to GRANT FINAL APPROVAL to the terms and conditions, provided that no challenges have been lodged during the public scrutiny period which require their amendment.

The reference file may be examined and will be available to interested parties at the Legal Department of the Manager’s Office for the Area for Economy, Resources and Economic Promotion, Plaça de Sant Miquel, s/n, Edifici Novíssim, planta 4, allowing for any relevant challenges to be presented via the General Registry for this City Council or any other office with a registry, as set out in article 16 of Act 39/2015, of 1 October, on the common administrative procedure for public administrations.

Period of display for public scrutiny: from 04/05/2021 to 01/06/2021 (first and last days included).

 