News

E.g., 25/11/2025
E.g., 25/11/2025
13/06/2025 - 11:43 h

Via Laietana closed for resurfacing on Sunday,15 June

Safety and prevention. Vehicles will not be able to circulate in Via Laietana on Sunday, between Pl. Antoni Maura and Pg. Colom, as the street is being resurfaced.

Detall d’un panell informatiu amb el recorregut de l’L4 entre La Pau i Trinitat Nova
12/06/2025 - 13:37 h

Maintenance work on the metro in the summer: partial closures on the L4 and L11

Mobility. The L4 metro line will only be working from La Pau to Verdaguer from 25 June to 31 August, and from La Pau to Maragall during the first week of September.

12/06/2025 - 12:11 h

Activation of preventative warning stage for high levels of PM10

Pollution. Municipal services are taking preventative measures, such as more intense watering down of streets and avoiding the use of air blowers.

10/06/2025 - 14:10 h

On 15 June: “Join in to conserve the sea and the beaches!”

Collective cleaning. Collective clean-up at the beaches.

04/06/2025 - 14:32 h

Disruptions to mobility for the Women’s Volta Ciclista a Catalunya 2025

Safety and prevention. The final stage of the second Women’s Volta Ciclista a Catalunya will affect mobility in Sants-Montjuïc on Sunday, 8 June, from 7.30 am.

02/06/2025 - 10:04 h

New reflective road surface to combat urban heat

Pla Clima. The pilot project will test a material that absorbs less solar radiation.

Espai de refresc del Bon Pastor
28/05/2025 - 14:52 h

Eight spaces with water games now available to freshen up in the summer

Pla Clima. There are twice as many as last year. They will be operating from 10 am to 1 pm and from 5 pm to 8 pm.

Part frontal de l'autobús X3 on es llegeix
26/05/2025 - 08:55 h

New express X3 service between Paral·lel and L’Hospitalet

Mobility and transport. Launch of the express X3 service to improve the connection between Barcelona and L’Hospitalet.

22/05/2025 - 13:30 h

On Saturday, 31 May, come to the opening festival for Ronda de Sant Antoni

Urban planning. On Saturday 31 May, from 10.30 am to 2.00 pm, come to the opening festival of Ronda de Sant Antoni!

21/05/2025 - 13:16 h

Two years in office and 85% of the government action plan is under way

Assesment of time in office. The municipal government makes a positive assessment of the first half of this term of office with 29% of actions from the action plan completed and 56% under way.

Pages