Work on the new city archive at Can Batlló to start in 2027 in 2027

Definitive step for the construction of the new City Archive, a grand cultural facility to be created on the Can Batlló site, declared as an asset of local cultural interest (BCIL). The project should revitalise this historical site in Sants-Montjuïc with a grand cultural facility open to the public and cultural stakeholders in our part of the world.

Render de l'entrada del nou Arxiu de la Ciutat de Barcelona a Can Batlló

Rendering of the entrance to the new Barcelona City Archive at Can Batlló.

01/07/2026 - 12:34 h - Municipal Archive

The municipal aim is for all the necessary administrative procedures to be completed this year so that work can get under way in 2027. A total of 98.1 million euros is expected to be invested to revamp the original elements of the building and prepare it to hold documental archives and offer different spaces for cultural dissemination, including exhibition rooms, educational classrooms, an auditorium and a grand agora etc. The centre should open to the public during the first quarter of 2034.

More accesible archive

The integration of the 23 facilities currently located around the territory into a single centre will allow users access to a single space of more than 70 kilometres of conserved documentation, spanning from the year 884 to the present day and offering optimum conditions for members of the public. The city currently handles nearly 30,000 enquiries a year, a volume which the new facility will be able to handle more efficiently and with better quality.

Similarly, the new archive will help strengthen the visibility and exposure of its activity and its cultural programme, becoming a clear and recognisable point of reference for members of the public and for the cultural system as a whole.

The idea behind the revamp is for the archive to go beyond the traditional concept of documentary deposit, to become more than a space for conserving archives and to redefine its role as living centre, open and permeable, which connects and strengthens local cultural activity with a clear vocation of promoting active participation by the community in the construction and recovery of collective memory. In the same way, the idea is also to have a vocation for internationalisation, taking advantage of the power and visibility that comes from grouping the city’s archives together under one roof.

Recovery of a historical building

The revamp of the building not only conserves the first building constructed on the Can Batlló site in 1878, but also consolidates the large chimney, the tower and part of the enclosing wall. The revamp will keep half of the building fully intact, while the other half will have up to six floors to hold documents. Everything will be visible from a large open-plan central agora with four entrances from different points, acting as a distribution area for the different spaces but also as a space for local people to pass through.

The project has also been designed taking into account the distribution and availability of the documentary deposits, with large comfortable areas with plenty of light for staff and users alike. Finally, the energy project makes use of and optimises the characteristic of the building and includes renewable energies such as solar panelling and geothermal systems. The joint venture made up of OP Team Arquitectura, Mendoza Partida and Ramon Valls is responsible for the renovation.

The new city archive also means a giant step in the transformation of the Can Batlló site, allowing for new connections between one side and the other and favouring the work of the different organisations and community associations operating there.

Roda de premsa de presentació del projecte de l'Arxiu de la Ciutat a Can Batlló, presidida per l'alcalde de Barcelona, Jaume Collboni, la regidora de Sants-Montjuïc, Raquel Gil, i l'arxivera en cap de l'Ajuntament de Barcelona, Ana Pazos

Press conference presenting the Barcelona City Archive project at Can Batlló, chaired by Barcelona Mayor, Jaume Collboni, Councillor for Sants-Montjuïc, Raquel Gil, and the Chief Archivist of Barcelona City Council, Ana Pazos

Fotografia de l'estat actual de la nau central de Can Batlló, on se situarà el nou Arxiu de la Ciutat de Barcelona. Autor: Adrià Goula

Photograph of the current state of the central warehouse at Can Batlló, where the new Barcelona City Archive will be located. Author: Adrià Goula.

Render de l'interior del nou Arxiu de la Ciutat de Barcelona a Can Batlló

Rendering of the interior of the new Barcelona City Archive at Can Batlló.

Cos lateral del 'Bloc 8' de Can Batlló, on se situarà el futur auditori de l'Arxiu de la Ciutat de Barcelona

Side wing of 'Warehouse 8' at Can Batlló, where the future auditorium of the Barcelona City Archive will be located

Fotografia de l'estat actual del 'Bloc 8' de Can Batlló, on se situarà el nou Arxiu de la Ciutat de Barcelona. Autor: Adrià Goula

Photograph of the current state of 'Warehouse 8' at Can Batlló, where the new Barcelona City Archive will be located. Author: Adrià Goula.