News

E.g., 21/11/2024
E.g., 21/11/2024
Image of the maritime façade with one of the installations to improve the mobile phone network
28/08/2024 - 13:59 h

Improvements to the mobile phone network and 5G coverage along the coast

Infrastructures. Various improvements have been made in the neighbourhoods of Barceloneta, Vila Olímpica and Poblenou, coinciding with the America’s Cup.

21/08/2024 - 13:06 h

La Marina del Prat Vermell to add 424 new social housing units

Housing. There will also be a cultural centre and a square that will continue the main corridor through the neighbourhood.

20/08/2024 - 14:10 h

TMB bus depot at Triangle Ferroviari will be the city’s first all-electric facility

TMB. Electrification of the Ferroviari Triangle depot continues, with an eye to becoming fully electric by 2026. 

15/08/2024 - 10:13 h

Increased cleaning coverage and operations under new graffiti removal contract

Pla Endreça. In the first six months of the new contract, the area cleaned increased by 30% and the number of operations by 15%.

12/08/2024 - 10:25 h

The procedure for sponsoring tree beds reopens

Take part in the programme and sponsor a tree bed.

11/08/2024 - 11:05 h

Groundwater network upgraded to improve drought resilience

Environment. The systems in Alfons el Magnànim, Palau Reial, Eixample and Can Batlló will be extended.

Stabilised slope on Montjuïc mountain, with the Torre Calatrava in the background
07/08/2024 - 13:14 h

Increased efforts to stabilise slopes in mountain districts

Urban planning and infrastructures. Over the next four years, work will be carried out on around twenty walls.

Two chimps suck on frozen fruit
06/08/2024 - 14:48 h

Zoo adapts to high temperatures, reduces its water consumption

Zoo. The keepers are taking extraordinary measures to ensure the health and welfare of the animals during periods of extreme heat.

Aerial view of the city from Gran Via de les Corts Catalanes with C/ Llacuna, in the direction from the Besòs towards the Llobregat
05/08/2024 - 13:07 h

How is the city’s air quality?

Health and safety. According to the findings of the assessment report, the city’s annual average NO2 levels in 2023 were the best on record.

Virtual image of the new Rambla
02/08/2024 - 10:00 h

Works to take place on three new stretches of La Rambla

La Rambla. From 5 August, the works on La Rambla will take place on new stretches on the side of the Gothic Quarter.

Pages