- Home
- / News
News
Construction work begins on Parc de les Tretze Roses, La Marina del Prat Vermell’s new green lung
Urban planning and infrastructures. The park’s construction work is expected to finish in the summer of 2023.
Three proposals for making visits to Park Güell and the Zoo more inclusive
Inclusion. Boasting a budget of 100,000 euros for their implementation, they are going to be tried out in a pilot test in mid-February.
Public transport is to be cheaper from 1 September on
Mobility. Monthly and quarterly travel passes, such as the T-usual and the T-jove card, will be half-price until the end of the year.
The Clariana de les Glòries consolidates its role as an outdoor public space
Free time. Over 100.000 people visited the site between September 2021 and July 2022.
Less noise and pollution with the opening of the tunnel in Glòries
Environment and sustainability. Current levels of NO2 and PM10 are 40% and 13% lower than those recorded at the pollution monitoring station in L’Eixample. Decibel levels have also been reduced from 74 to 65 decibels.
Subsidies to improve sound insulation for homes in areas with high noise levels
City Council. Each owner-tenant community can apply for subsidies of between 30,000 and 50,000 euros per building, up to a limit of 3,000 euros per home.
Subsidy application period open for the Collserola Agricultural Contract
Sustainable food. » The Collserola Agricultural Contract is aimed at achieving a more decent agri-food model for farmers and maintaining greater balance in the area, for instance by minimising fires
Work starts on solar panelling to provide local power at the Ronda del Litoral
Sustainability. The panels will generate 43,000 kWh/year of electricity, equivalent to the annual consumption of eighteen families.
Work gets under way on the green streets in L’Eixample: how will mobility change?
Mobility. Vehicles will not be able to cover two consecutive sections and will have to turn at each block.
Terraces in some parts of Gràcia and Sants Montjuïc required to close earlier
City Council. The plan to cut noise pollution in the squares also includes staff on duty in Gràcia from 8 pm until closing time.