- Home
- / News
News
Check where to leave your Christmas tree after the festive season
Recycling. A total of 227 collection points are open from 7 to 17 January around the city’s ten districts, enabling Christmas trees to be recycled and used to maintain gardens and green spaces.
Work begins on the L8 extension on Monday, 8 January
Public works. The L8 extension works will include the construction of a four-kilometre tunnel, three new stations and the renovation of two existing ones.
Disruptions to mobility for the Three Kings Parade 2024
Safety and prevention. Most traffic restrictions will apply from 5 pm to 9.30 pm on Friday.
New traffic signs obliging riders to get off bikes and scooters installed at another 24 points in Ciutat Vella
Mobility and transport. A team of information staff will be operating around the district from 8 January.
Carrer Mandri closed for work on the L9 and L10 metro station
As from 8 January, the section of C/ Mandri between Pg. Bonanova and C/ Bigai will be completely closed to traffic.
New inclusive children’s play area in the neighbourhood of El Congrés i els Indians
Children. The goal is for 90% of citizens to have one of these spaces within 10 minutes of their home in 2025.
Road closures and parking restrictions for New Year’s Eve celebration on Maria Cristina
Mobility. Barcelona will ring in the New Year with a spectacular celebration on Avinguda de la Reina Maria Cristina, as a result of which roads in the surrounding area will be closed to traffic.
Mort and Phil help control pedestrian crossing in Eixample
New pedestrian signals featuring Mort and Phil have been installed at the intersection of Ronda de Sant Pere and Passeig de Gràcia.
More trains and higher frequencies for the metro in 2023
One hundred and sixty-five trains run during the morning rush hour, ten more than in 2019, increasing the frequency to less than three minutes.
The public housing stock grows with 746 new flats
Housing. The new blocks bring the number of municipally owned homes to over 12,300.