News

E.g., 16/09/2024
E.g., 16/09/2024
22/01/2022 - 10:25 h

Plaça del Canòdrom to get garden elements to foster public use

Urban planning. There will be an agora for public activities, a dog area, a basketball net, a super children’s games area, greenery and shaded spaces.

20/01/2022 - 11:52 h

Update to the measures to combat the spread of Covid-19

COVID-19. Mobility is also restricted at night. The measures will be in force until January 21.

14/01/2022 - 14:43 h

Work completed in the former Plaça d’Armes at the Parc de la Ciutadella

Plaça Joan Fiveller. The work has helped improve the site at an environmental level, at the same time allowing for work on the archaeological remains there.

Can Peguera
14/01/2022 - 12:05 h

Nearly eighty measures planned as part of the Neighbourhood Plan in 2024

Urban planning. The municipal project works to reduce inequalities between different areas of the city.

Districte de Gràcia
13/01/2022 - 14:33 h

New urban planning to protect the heritage and identity of Gràcia

The plan protects heritage from social, environmental and urban planning perspectives, introducing changes to the initial proposal based on the challenges made and joint work with local people, organisations and the ERC.

08/01/2022 - 10:25 h

Transformation of the Moll de Mestral wharf and the sea wall

Work gets under way in April and should be completed in the first quarter of 2023.

06/01/2022 - 11:50 h

The general subsidy call for 2022 opens

Applications can be made online until 27 January.

06/01/2022 - 10:37 h

227 collection points for Christmas trees all around the city

Environment and sustainability. The points will be in place in all ten city districts from 7 to 17 January

Hivernacle del Parc de la Ciutadella
04/01/2022 - 10:03 h

Renovation of the Hivernacle and the Palau del Marquès d’Alfarràs

Work gets under way in July and will take between 9 and 12 months. The budget is two million euros for the Hivernacle and 1.4 million for the Palau del Marquès d’Alfarràs.

01/01/2022 - 20:28 h

Passeig de la Verneda gets a more sustainable new road surface

Urban planning. This type of asphalt will be laid in other parts of the city if the results from the pilot project are satisfactory.

Pages