- Home
- / News
News
High season at Barcelona’s beaches
Environment and sustainability. Municipal services linked to the Barcelona coast will be operational from 27 May to 11 September.
The forest fire prevention campaign gets under way
Safety and prevention. The Barcelona Fire Service is stepping up its operations to cope with the summer months.
Over a hundred species in danger of extinction in Catalonia
Environment and sustainability. The Barcelona Zoo Foundation took part in the study on the state of biodiversity in Spain.
Children’s play area open in Can Batlló
Bordeta. The play area at Can Batlló opens this weekend, with nearly 1,000 square metres of space within the perimeter walls of the old Block 12, which will be closed at nights.
Five transformations in urban planning and public transport with Next Generation funds
Urbanísme i infraestructures. The European funding is aimed at decarbonising urban areas and promoting sustainable mobility.
New bike lane section open in Ronda Sant Pere
Mobility. Cyclists can now use the lane covering the section between the streets of Girona and Roger de Llúria.
Work tendered for the new green avenue in Gran Via in Sant Martí
Barcelona Superblock. The definitive revamp of the area of 70,000 square metres starts in 2024.
Barcelona steps up its green energy generation with 8 projects to install photovoltaic panels on large facilities in the city
The Mechanism for Sustainable Energy in Barcelona (MES Barcelona) installs photovoltaic panels on large buildings such as Mercabarna, making it the largest rooftop photovoltaic self-consumption plant in the Iberian Peninsula. The...
Europan 17 chooses regeneration projects for El Besòs i el Maresme
Urban regeneration. Europan 17, the architecture contest aimed at young professionals, gets under way. In Barcelona’s case, the search is on for urban regeneration projects for El Besòs i el Maresme.
Administrative steps completed to renew more sections of Via Laietana and Av. Meridiana
Urban planning. Definitive approval at the commission stage for the two final projects to continue the current remodelling project during the next term of office.